Termite proofing work procedure is a chemical to destroy bacteria in the soil of the land. ‘Destroy termites before they destroy your house‘. There are places that are not termite-proof. Termites cause walls, wood, and concrete to become porous by eating them. Hence,…
Damp proofing course in plinth is the seepage of water through the members of the building. There is very little difference between leakage and damp proof. water comes out of the slab of the bathroom toilet. it is leakage and if the presence…
From the architectural and engineering point of view, the plinth beam work procedure is the most important activity. building construction. All the peripheral and internal room dimensions are to be checked at this stage of the work and offsets and projections of the building are to…
The term P.C.C. stands for plain Cement Concrete work procedure. Before starting any R.C.C. or masonry work directly on the excavated soil, P.C.C. is done to form a leveled surface. P.C.C. is done on the excavated soil strata oron soling provided. Unless specified, a…
Excavation and foundation work procedure is the preliminary activity of the construction project It starts from digging pits for the building foundations work procedure and continues up to the handing over of the project. EXCAVATION AND FOUNDATION WORK PROCEDURE Excavation is needed for Foundations of…